2016 – today Cell culture-based Pharmaceutical Production Plant
Construction of a multi-product manufacturing facility with Focus Factory approach in another European country.
Scheduling, progress control, interface management, planning and executing phases
2015 Revision Bexbach Power Station (Saarland)
Exchange of heating surfaces, exchange of membrane walls, distribution, tendering,
Preparatory work, order processing, project management on site, progress, cost and quality control
2013 Revision Weisweiler Power Station Block F
Exchange of super heater heating surfaces and accumulators
Investment: €3.6 million
Preparatory work, order processing, project management on site, progress, cost and quality control, EHS Management
Roche Diagnostics Deutschland GmbH
Service contract for industrial steam generators
Preparatory work, order processing, project management on site, progress, cost and quality control, EHS Management
2011 New construction of Porsche AG‘s test center
New construction of a test and development center of Porsche AG, with wind tunnel, electric center as well as model workshops and infrastructure connection.
Investment: around €150 million
Assistance of the project manager, progress, cost and quality control
2011 Caucasus Hostel Telawi
Planning of a hotel building used both as a student dormitory as well as a backpacker’s hostel in Telawi, Georgia.
Investment: around € 2.5 million
Project development, cost planning and scheduling during the first project phases
2009-2011 Waste management concept Telawi
Planning of a domestic waste dump site as well as a waste management concept for Kakheti (Georgia) in cooperation with the Society for Technological Collaboration (Gesellschaft für Technische Zusammenarbeit - GTZ)
Investment: €2.4 million
Project development, awarding of planner contracts, progress, cost and quality control
2009-2011 Telawi State University Georgien
Development of a study program at the State University Telawi (Georgia) in project management, focusing on construction and real estate. Financed by Volkswagenstiftung in Hannover
Investment: €8 million
Assistance of the project manager, teaching assignment, cost and progress control
2010 Structural expansion Khomanani Primary School
Planning of a school building as expansion of Khomanani Primary School in the South West Townships of Johannesburg (Soweto), South Africa, commissioned by the Ministry for Development and International Cooperation
Investment: € 0.5 million
Project development, preparation of a draft, awarding of architectural services, progress and cost control
2008 Hochtief Facility Management
Management and maintenance of Athens International Airport Eleftherios Venizelos as well as Olympic venues in Greece.
Internship abroad, correction of faults, setting up and maintaining a fault database
2007 Maleakos Kleidi JV
250km highway that serves as a North-South connection in the eastern part of Greece; as part of a PPP project it is partially being rebuilt, expanded or commissioned and is subsequently going to be operated for 25 years
2002 Jordanbad Biberach (Riß)
Locksmith work and metalwork
Assembly supervisor and foreman
1999-2000 Expo Hannover German pavilion
Locksmith work and metalwork
Management of fault correction and subsequent works
Boehringer Ingelheim Pharma GmbH & Co. KG
Laying of V4A pipes and working with pressure parts
Investment: € 0.4 million
Preparatory work, progress, cost and quality control, EHS Management